Indeed... there is a Jim sized crack for him to crawl through
Otherwise, for right now, it's pull the equipment rack out and go in that way. I've finished up getting the two side walls covered, and up. I've gotten the speaker shelves installed behind the center and side panels.
Now I'm working on getting the SV subs back behind and the cables run... Now if Jim will just get his ass back to Washington, I can have him run around in the attic to run the DVI cable for the projector
I'll probably post more pictures on Monday. The room is 18x12 (before the wall). I'll have to measure again, once it's finished.
Chromy